Pages

Friday, July 6, 2012

VICF Foundation

VICF foundations the only way to go with 50% faster than brick ICF and 0 to 10% waste.
the install will run much smother with metal channel attached to the footing then you install corner post and level and secure.
with VICF you install one side first then when one side is finished you can install re bar if needed and also electrical and plumbing .
finally you set in the other side and brace the corners and the wall on the inside only every 10 '.


when ordering this product it is cut to fit and goes up so fast and is stronger than block ICF so less bracing is needed
www.custom1contracting.com